Launch offer — valid today only

📄 Digital book in PDF · read it on your phone or print it

Street Works Illustrated: Every Distance, Zone and Layer in Drawings One Site Topic on Every Page

For your street works card and assessment: sign distances, tapers, the cable locator, compaction, reinstatement layers and a part for supervisors. One topic per page: the drawing first, then the numbers you need. 64 illustrated pages.

START REVISING THIS WAY

🔒 Secure checkout · PDF by email · 30-day guarantee

Every topic, its own pageEach site layout and road section drawn, with the explanation beside it
64 illustrated pages9 parts, from the law behind every hole in the road to the checklist for the classroom day
Up-to-date sourcesSafety at Street Works code of practice, SROH 4th edition and HSE HSG47
PDF by emailFormat

Look Inside the Book

Every page has one large drawing and a box with the distances, layers and steps you need to know:

Seven steps on every site; take down in reverse, 'Road works ahead' sign last.
Seven steps on every site; take down in reverse, 'Road works ahead' sign last.
Sideways safety zone S: 0.5 m up to 40 mph, 1.2 m at 50 mph+ and dual carriageways
Sideways safety zone S: 0.5 m up to 40 mph, 1.2 m at 50 mph+ and dual carriageways
Works on the driver's left → Keep right · works on the driver's right → Keep left
Works on the driver's left → Keep right · works on the driver's right → Keep left
Power finds loaded cables, Radio long metal services, Genny only what you connect
Power finds loaded cables, Radio long metal services, Genny only what you connect
Exposed services: supported along their length, never hung, never used as a shelf
Exposed services: supported along their length, never hung, never used as a shelf
Flexible reinstatement in section: surface course, binder course, base and sub-base.
Flexible reinstatement in section: surface course, binder course, base and sub-base.
Hand-back: ±6 mm at the edges, signs off in reverse, 'Road works ahead' last.
Hand-back: ±6 mm at the edges, signs off in reverse, 'Road works ahead' last.
8 steps on one page: sign at 20–45 m, 0.5 m zones, 500 mm from the line, 6 months to permanent.
8 steps on one page: sign at 20–45 m, 0.5 m zones, 500 mm from the line, 6 months to permanent.

Swipe to see more →

These are real pages from the book. The table of contents is the full one: 9 parts and 60 topics.

The Problem Isn't You. It's How It Was Explained to You.

You're in the classroom with a blank road plan in front of you. The question: how far before the works does the first sign go on a 40 mph road? You put that sign out every week, and now the number won't come.

The manual covers it in paragraphs: distance D, a range for each speed limit, notes on visibility, all in running text. Nothing on the page looks like the road you actually stand on.

Works on the driver's left → Keep right · works on the driver's right → Keep left

In Street Works Illustrated it's one page: the road drawn from above, the 'Road works ahead' sign set back from the works and distance D marked for each road: 20–45 m at 30 mph, 45–110 m at 40 mph, and further again on faster single and dual carriageways.

The same goes for the lead-in taper, cone spacing, lamp positions, the three cable locator modes and the layers of a flexible reinstatement: each one has its own page.

You see the sign set back on the drawing and you know the distance without going back to the manual. On site and in the classroom, it's the same picture.

COMPARE FOR YOURSELF

The Same Topic, Two Ways to Study It

THIS
  • The manual: line after line
  • Tapers and safety zones explained only in words
  • You walk into the assessment unsure
A lead-in taper shall be provided on the approach side of the works, its length being determined by reference to the speed limit of the road and the width by which the obstruction projects into the carriageway. For each metre of such width, the required taper length increases according to the applicable speed band. Beyond the taper, a longitudinal safety zone shall be maintained between the end of the taper and the working space, the length of which varies with the speed of traffic and the category of road concerned.
FOR THIS
  • The lead-in taper in one drawing
  • The metres for each speed in a box
  • You see it and it makes sense
Sideways safety zone S: 0.5 m up to 40 mph, 1.2 m at 50 mph+ and dual carriageways
CONTENTS

Take a Look at the 9 Parts and 60 Topics

Before you set out, site layout and zones, signs and traffic control, lighting and guarding, locating underground apparatus, excavation and compaction, reinstatement, a part for supervisors and revision checklists: 64 pages, all illustrated.

IBefore You Set Out · pp. 5-9
  1. The Law Behind Every Hole in the Road
  2. Your Card and Your Units
  3. Who Does What on a Street Works Site
  4. Notices and Permits in One Picture
  5. The Site Order: Set Out, Work, Take Down
IISite Layout and Zones · pp. 10-16
  1. The Four Zones of Every Site
  2. Sideways Safety Zone by Speed Limit
  3. Lead-in Taper and Longitudinal Safety Zone
  4. Width Left for Traffic
  5. Working in the Footway
  6. Sites at Junctions and Bends
  7. Storing Plant, Spoil and Materials
IIISigns, Cones and Traffic Control · pp. 17-25
  1. The Signs You Put Out, in Order
  2. Sign Distances Before the Works
  3. Sign Sizes and Where to Stand Them
  4. Cones: Taper Spacing and Along the Site
  5. Keep Left or Keep Right Arrow
  6. Give and Take: When It Is Allowed
  7. Stop/Go Boards
  8. Portable Traffic Signals
  9. Taking Down in Reverse Order
IVLighting, Guarding and Pedestrians · pp. 26-31
  1. When Lamps Are Required
  2. Lamp Positions on Cones and Barriers
  3. Pedestrian Barriers and Tapping Rails
  4. Fully Fencing an Excavation
  5. Ramps, Crossings and Temporary Walkways
  6. Vulnerable Users: Wheelchairs, Buggies and Blind People
VLocating Underground Apparatus · pp. 32-39
  1. Records First: Plans Before You Dig
  2. Colours of Buried Services
  3. Typical Depths in Footway and Carriageway
  4. The Cable Locator: Power, Radio and Generator Modes
  5. Sweeping the Site Correctly
  6. Marking Out What You Found
  7. Trial Holes and Hand Digging Near Services
  8. If You Hit or Damage a Service
VIExcavation, Backfill and Compaction · pp. 40-47
  1. Cutting the Surface Before You Dig
  2. Keeping the Trench Safe
  3. Protecting Exposed Services
  4. Surround and Marker Tape
  5. Backfill Materials: What Can Go Back In
  6. Layer Thickness for Compaction
  7. Number of Passes by Compactor
  8. Compaction Faults You Can See
VIIReinstatement · pp. 48-55
  1. Road Types by Traffic Load
  2. Interim and Permanent Reinstatement
  3. Flexible Surface in Section View
  4. Concrete Surface in Section View
  5. Modular Surfaces: Blocks and Flags
  6. Footways and Verges
  7. Edge Sealing and Surface Tolerances
  8. The Guarantee Period
VIIIFor Supervisors · pp. 56-60
  1. The Supervisor's Role on Site
  2. Planning the Site Layout
  3. Monitoring and Site Inspections
  4. Records You Must Keep
  5. Handing Back the Site
IXRevision and Checklists · pp. 61-64
  1. One Site, Start to Finish
  2. Numbers Worth Having at Hand
  3. The Most Common Mistakes, Drawn
  4. Checklist for the Classroom Day

One Page, One Topic, All Clear

Think of it this way:

It's the classroom day and the assessor asks how long the lead-in taper should be for works sticking two metres out into a 40 mph road. You need the answer, not a vague memory of a paragraph.

You open the taper page and see the cones drawn from above, angling out from the kerb, with the metres per metre of width written beside each speed band and the longways safety zone marked before the working space.

Exposed services: supported along their length, never hung, never used as a shelf

Same with sign distances, the cable locator modes, compaction passes, the flexible section and handing back the site: each one on its own page.

Street Works Illustrated is 9 parts and 60 topics, all drawn, and at the end one full site from start to finish, the key numbers on one sheet and a checklist for the classroom day.

What you see drawn, you don't have to memorize.

What's Inside Street Works Illustrated:

Ipp. 5-9

Before You Set Out

The law behind street works, your card and units, who does what on site, notices and permits, and the order you set out, work and take down.

IIpp. 10-16

Site Layout and Zones

The four zones of every site, the sideways safety zone by speed limit, lead-in taper and longways zone, width left for traffic, footway sites, junctions and bends, and where plant and spoil go. You see the site from above and know each distance before the first cone goes down.

IIIpp. 17-25

Signs, Cones and Traffic Control

The signs in the order you put them out, sign distances and sizes, cone spacing, keep left or right arrows, give and take, Stop/Go boards, portable traffic signals and taking down in reverse.

IVpp. 26-31

Lighting, Guarding and Pedestrians

When lamps are needed and where they go, pedestrian barriers and tapping rails, fully fencing a hole, ramps and walkways, and wheelchair, buggy and blind users.

Vpp. 32-39

Locating Underground Apparatus

Records before you dig, the colours and typical depths of buried services, the cable locator's three modes, sweeping and marking out, trial holes and what to do if you hit a service. You know what a silent sweep can and can't tell you.

VIpp. 40-47

Excavation, Backfill and Compaction

Cutting the surface, keeping the trench safe, protecting exposed services, surround and marker tape, backfill materials, layer thickness, passes by compactor and faults you can see.

VIIpp. 48-55

Reinstatement

Road types by traffic load, interim and permanent reinstatement, flexible, concrete and modular surfaces in section, footways and verges, edge sealing, tolerances and the guarantee period.

VIIIpp. 56-60

For Supervisors

The supervisor's role, planning the layout, monitoring and inspections, the records you must keep and handing the site back.

IXpp. 61-64

Revision and Checklists

One site from start to finish, the numbers worth having at hand, the most common mistakes drawn and a checklist for the classroom day.

At the end of the book: One full site from start to finish, the key numbers on one sheet, the most common mistakes drawn and a checklist for the classroom day.

Plus: 2 Free Books

Street Works Practice Questions

BONUS 1: «Street Works Practice Questions»

Value on its own: US$ 17.90

Assessment-style questions on every unit, each with its answer and the page to go back to, so you can find your gaps before the classroom day rather than in it.

15 Site Mistakes, Before and After

BONUS 2: «15 Site Mistakes, Before and After»

Value on its own: US$ 14.90

The most common mistakes on a street works site drawn wrong and then right, from a missing safety zone to compacting a layer that's too thick, so you can spot them at a glance.

Street Works Illustrated with 2 Free Books

  • Street Works Illustrated: 64 illustrated pagesUS$ 63
  • BONUS 1: Street Works Practice QuestionsUS$ 17.90
  • BONUS 2: 15 Site Mistakes, Before and AfterUS$ 14.90
  • High-resolution PDF to printIncluded
Total value US$ 95.80
YOUR PRICE:
US$ 27
You save US$ 68.80
YES, I WANT STREET WORKS ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

Secure purchaseEncrypted payment30-day guarantee

PDF by email: We email you Street Works Illustrated as a PDF, together with the two free books. It's a single payment: no installments, no extra charges.

Who This Book Is For

You're renewing your card

You're renewing your card

You've done the job for years. The book puts the distances, zones and layers you already use on one drawn page each, so revising takes evenings, not weekends.

Your classroom day is close

Your classroom day is close

You go through the site in the order you set it out, then check the key numbers on one sheet and run through the classroom day checklist.

You're stepping up to supervisor

You're stepping up to supervisor

The supervisor part draws out planning the layout, monitoring, the records to keep and handing back the site, ready to print and keep in the van.

Everything You Get Today

US$ 95.80US$ 27
YES, I WANT STREET WORKS ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

30DAYS
GUARANTEE

30-Day Guarantee

Try Street Works Illustrated for 30 days, bonus books included.

We refund everything if the file won't open, if the book isn't what you see here, if you were charged twice or if the email doesn't arrive. Just email us.

You pay once. No subscriptions.

Frequently Asked Questions

Is it for me if I've done street works for years and just need to renew my card?

Yes. It doesn't explain what a cone is. It puts the distances, zones, layers and steps the assessment asks about on one drawn page each, in the order you set out a site. There's also a part for supervisors.

Where does the content come from?

It's checked against the current Safety at Street Works and Road Works code of practice, the Specification for the Reinstatement of Openings in Highways (4th edition in England, with notes on Wales and Scotland), HSE HSG47 and the NJUG guidance on apparatus. Check the current assessment format and renewal interval with your training provider.

Is it official material?

No. It's an independent study guide, not affiliated with or endorsed by any awarding body, register or authority. Nothing is copied from the code: every topic is drawn and explained in our own words.

Does it replace the course?

No. It doesn't give you a certificate or a card and it doesn't count as training. You still need the accredited course and assessment, and your card comes from the register. The book is for revising before and after, and for having the numbers at hand on site.

Are the practice questions the ones from the assessment?

No. They're written for this book, in the style of the assessment, each with its answer and the page to go back to.

When and how does it arrive?

As a PDF by email, sent to the address you enter at checkout. The 2 bonus books come the same way.

Do I have to pay every month?

No. It's a one-off payment, with no subscription.

Can I have it on paper?

Yes. The PDF is made to print, at home or at a print shop, so you can keep it in the van.

How does the refund work?

You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.

Before You Close This Page

No more rereading with nothing sticking.

Sign distances and tapers: you see them drawn, and that's it.

You walk into the assessment knowing where everything is.

Drawings make studying faster.

The book is right below.

One-time payment: US$ 27 · Guarantee: 30 days · PDF by email

YES, I WANT STREET WORKS ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.