📄 Digital book in PDF · read it on your phone or print it
For your street works card and assessment: sign distances, tapers, the cable locator, compaction, reinstatement layers and a part for supervisors. One topic per page: the drawing first, then the numbers you need. 64 illustrated pages.
🔒 Secure checkout · PDF by email · 30-day guarantee
Every page has one large drawing and a box with the distances, layers and steps you need to know:








Swipe to see more →
These are real pages from the book. The table of contents is the full one: 9 parts and 60 topics.
You're in the classroom with a blank road plan in front of you. The question: how far before the works does the first sign go on a 40 mph road? You put that sign out every week, and now the number won't come.
The manual covers it in paragraphs: distance D, a range for each speed limit, notes on visibility, all in running text. Nothing on the page looks like the road you actually stand on.

In Street Works Illustrated it's one page: the road drawn from above, the 'Road works ahead' sign set back from the works and distance D marked for each road: 20–45 m at 30 mph, 45–110 m at 40 mph, and further again on faster single and dual carriageways.
The same goes for the lead-in taper, cone spacing, lamp positions, the three cable locator modes and the layers of a flexible reinstatement: each one has its own page.
You see the sign set back on the drawing and you know the distance without going back to the manual. On site and in the classroom, it's the same picture.

Before you set out, site layout and zones, signs and traffic control, lighting and guarding, locating underground apparatus, excavation and compaction, reinstatement, a part for supervisors and revision checklists: 64 pages, all illustrated.
Think of it this way:
It's the classroom day and the assessor asks how long the lead-in taper should be for works sticking two metres out into a 40 mph road. You need the answer, not a vague memory of a paragraph.
You open the taper page and see the cones drawn from above, angling out from the kerb, with the metres per metre of width written beside each speed band and the longways safety zone marked before the working space.

Same with sign distances, the cable locator modes, compaction passes, the flexible section and handing back the site: each one on its own page.
Street Works Illustrated is 9 parts and 60 topics, all drawn, and at the end one full site from start to finish, the key numbers on one sheet and a checklist for the classroom day.
What you see drawn, you don't have to memorize.
The law behind street works, your card and units, who does what on site, notices and permits, and the order you set out, work and take down.
The four zones of every site, the sideways safety zone by speed limit, lead-in taper and longways zone, width left for traffic, footway sites, junctions and bends, and where plant and spoil go. You see the site from above and know each distance before the first cone goes down.
The signs in the order you put them out, sign distances and sizes, cone spacing, keep left or right arrows, give and take, Stop/Go boards, portable traffic signals and taking down in reverse.
When lamps are needed and where they go, pedestrian barriers and tapping rails, fully fencing a hole, ramps and walkways, and wheelchair, buggy and blind users.
Records before you dig, the colours and typical depths of buried services, the cable locator's three modes, sweeping and marking out, trial holes and what to do if you hit a service. You know what a silent sweep can and can't tell you.
Cutting the surface, keeping the trench safe, protecting exposed services, surround and marker tape, backfill materials, layer thickness, passes by compactor and faults you can see.
Road types by traffic load, interim and permanent reinstatement, flexible, concrete and modular surfaces in section, footways and verges, edge sealing, tolerances and the guarantee period.
The supervisor's role, planning the layout, monitoring and inspections, the records you must keep and handing the site back.
One site from start to finish, the numbers worth having at hand, the most common mistakes drawn and a checklist for the classroom day.
At the end of the book: One full site from start to finish, the key numbers on one sheet, the most common mistakes drawn and a checklist for the classroom day.

Assessment-style questions on every unit, each with its answer and the page to go back to, so you can find your gaps before the classroom day rather than in it.

The most common mistakes on a street works site drawn wrong and then right, from a missing safety zone to compacting a layer that's too thick, so you can spot them at a glance.
📄 This is a digital PDF book sent to your email: nothing is printed or shipped.
PDF by email: We email you Street Works Illustrated as a PDF, together with the two free books. It's a single payment: no installments, no extra charges.
You've done the job for years. The book puts the distances, zones and layers you already use on one drawn page each, so revising takes evenings, not weekends.
You go through the site in the order you set it out, then check the key numbers on one sheet and run through the classroom day checklist.
The supervisor part draws out planning the layout, monitoring, the records to keep and handing back the site, ready to print and keep in the van.
📄 This is a digital PDF book sent to your email: nothing is printed or shipped.
Try Street Works Illustrated for 30 days, bonus books included.
We refund everything if the file won't open, if the book isn't what you see here, if you were charged twice or if the email doesn't arrive. Just email us.
You pay once. No subscriptions.
Yes. It doesn't explain what a cone is. It puts the distances, zones, layers and steps the assessment asks about on one drawn page each, in the order you set out a site. There's also a part for supervisors.
It's checked against the current Safety at Street Works and Road Works code of practice, the Specification for the Reinstatement of Openings in Highways (4th edition in England, with notes on Wales and Scotland), HSE HSG47 and the NJUG guidance on apparatus. Check the current assessment format and renewal interval with your training provider.
No. It's an independent study guide, not affiliated with or endorsed by any awarding body, register or authority. Nothing is copied from the code: every topic is drawn and explained in our own words.
No. It doesn't give you a certificate or a card and it doesn't count as training. You still need the accredited course and assessment, and your card comes from the register. The book is for revising before and after, and for having the numbers at hand on site.
No. They're written for this book, in the style of the assessment, each with its answer and the page to go back to.
As a PDF by email, sent to the address you enter at checkout. The 2 bonus books come the same way.
No. It's a one-off payment, with no subscription.
Yes. The PDF is made to print, at home or at a print shop, so you can keep it in the van.
You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.
No more rereading with nothing sticking.
Sign distances and tapers: you see them drawn, and that's it.
You walk into the assessment knowing where everything is.
Drawings make studying faster.
The book is right below.
One-time payment: US$ 27 · Guarantee: 30 days · PDF by email
YES, I WANT STREET WORKS ILLUSTRATED FOR US$ 27📄 This is a digital PDF book sent to your email: nothing is printed or shipped.